Shanghai Nonferrous Metals News

29th July: The No. 3 NPI production line of the Jinchuan WP&RKA Nickel project in Indonesia has yielded a first batch of NPI. This marks significant progress after Jinchuan’s No. 4 NPI production line came online in May 2019. At present, Jinchuan WA&RKA’s No. 3 and No. 4 production lines are operational.

29th July: Jinchuan Group increased the ex-works price for electrolytic nickel plate and barreled electrolytic nickel blocks by RMB 2,000/t to RMB 113,500/t and RMB 114,700/t respectively.

 

Read More

 

CM Group Newsletter

Sign up to the CM Group newsletter to receive regular publications.